Content - Bomex Shanghai: New Plant Project

Bomex Shanghai: New Plant Project

16.02.2018|

On November 28, 2018, in the Songjiang Economic and Technological Development Zone, Shanghai, China, the solemn foundation ceremony of the new Bomex plant with a production capacity of 30,000 tons took place.

The total investment of the new Bomex plant project amounts to 150 million RMB, and the total construction area consists of 17.600 square meters. The construction is expected to be completed in November 2019, and the new facility will be operational by April 2020. At the same time, the company is building an independent research and development center covering 2,900 square meters, which will be the first and only one of its kind in the Berlac Group in Asia.

With the new high-tech plant in the G60 Shanghai Songjiang Economic Belt, the Berlac Group and its subsidiary Bomex are entering a new era, significantly improving their competitiveness in the fast-growing Asian market.

Design sketch of the planned Bomex factory.
Jun Gu, Director of Songjiang National Economic and Technological Development Zone, Shanghai China, and Mr. Paul Yuen, General Manager of Bomex.
Ceremonial laying of the foundation stone.
The proud Bomex team posing in front of their factory to become.

News

Agenda 2019

PSE Europe, Munich, Germany

ISL and Bomix exhibiting at PSE Europe, March 26 - 28

Basler Lacke exhibiting at Swiss Floor

April 03 - 05 | Swiss Trade Fair for Flooring Competence | Lucerne

Berlac exhibiting at Hong Kong Optical Fair

November 06 - 08 | Int. Trade Fair for the Spectacle Industry | Hong Kong

Basler Lacke at Hofmann Expo

November 29 | Road Marking Technology Day | Rellingen | Germany

Offene Stellen

Einkäufer (w/m) 80-100%

Zur Ergänzung und Verstärkung unseres Teams suchen die Basler Lacke am Standort Buchs (AG), Schweiz, sofort oder nach Vereinbarung eine/n Einkäufer/in für den operativen Einkauf.

Footer